Experience unparalleled strength and longevity with our Durable Welding Frames, meticulously engineered to cater to the most demanding heavy-duty welding applications. Our frames promise unwavering stability and resilience, ensuring your projects are built upon a foundation of excellence and endurance.


| Feature | Details |
|---|---|
| Material | Carbon Steel, Stainless Steel, Alloy Steel, Aluminum Alloy |
| Drawing format | 3D/CAD/DWG/STEP/PDF |
| Metal Processing | Laser cutting, welding, milling, drilling, stamping, CNC center |
| Certification | ISO9001:2015 |
| Precision | ±0.01~1.0mm |
| Surface treatment | Powder coating, Zinc plating, polishing, spraying, painting |
| Service | OEM / ODM, Production to sample/chart |



| Available Material | carbon steel, stainless, aluminum, brass, copper, bronze, Nylon, plastic etc. |
| Finish Treatment | polish, zinc, hard anodizing, nickel plating, powder coating, sandblasting etc. |
| Heat Treatment | annealing, quenching hardening, blacking, tempering, nitriding etc. |
| Equipment Name | Brand/Model | Processing Range (mm) | Qty |
|---|---|---|---|
| 20000W High Power Laser Cutting Machine | DX | 5000*3200*1800 | 1 |
| 12000W High Power Laser Cutting Machine | DX | 12000*3500*500 | 1 |
| Fiber laser tube cutter | Han's Laser | 6000*180*180 | 1 |
| CNC Gantry Machining Center | DX | 6000*2000*1000 | 6 |
| Dioxide protection welding machine | PC/Panasonic | KH-300/KH-500 | 16 |
Our state-of-the-art fabrication process begins with precision engineering and meticulous planning, ensuring each component is crafted to perfection. Advanced welding techniques are then employed to fuse the steel structures with robust frames, guaranteeing unparalleled durability and strength.






1. Durable wooden cases for robust protection
2. Versatile paper packaging for lightweight items
3. Protective foam packing for delicate products.
• Express (DHL/UPS/FedEx): Best for under 50kg, 1-10 days.
• Air Freight: 50kg to 200kg, 1-7 days.
• Sea Freight: Over 200kg, 2-60 days based on route.
• Land Transport: Reliable delivery within 5-28 days.