Scuba Diving Plate Wing Double Harness System

Still deciding? Get samples of $ !
Order Sample

Product Description

i

Basic Specifications

Model NO.
Harness System
Usage
Diving, Surfing, Triathlon, Windsurfing
Size
Custom
Certification
CE, ISO9001, CCC, TS16949
Process
CNC Machining, Laser Cutting
Materials
Carbon Fiber, Aluminum, Stainless Steel, Titanium
Surface
Anodized Coating, Polishing
Delivery
5-20 Days
Quality
100% Testing
Scuba Diving Plate Wing Double Harness System
P

Detailed Photos

Scuba Diving Equipment Detail 1 Scuba Diving Equipment Detail 2 Scuba Diving Equipment Detail 3
Scuba Diving Equipment Detail 4 Scuba Diving Equipment Detail 5
T

Technical Parameters

Quality Control 100% Inspection using CMM, Projection, Calipers, and Micro calipers.
Machining Equipment CNC machining, Turning, Milling, Center machine, Laser cutting, Bending, Punching, and Stamping machines.
Surface Finish Anodized, Oxide, Plating, Brushing, Polishing, Powder coating, Sandblasting, and Laser engraving.
Drawing Formats PDF, CAD/DWG/DXF, IGS/STP etc.
Q

Quality Assurance

Specialized QC testers check product quality according to strict requirements.
IQC: Incoming material dimension and surface inspection.
PQC: Full-course inspection during the entire manufacturing process.
FQC: 100% final inspection before shipment for all plating and finished products.
Manufacturing Process
?

Frequently Asked Questions

Q1: How is quality ensured?
All processes strictly adhere to ISO9001:2018 procedures. We maintain strict quality control from production to delivery with strong technology support.
Q2: Can you meet high precision tolerance requirements?
Yes, we can provide high-precision parts and manufacture strictly according to your provided drawings.
Q3: What is the standard delivery time?
Standard parts take 7-20 days, while non-standard customized parts typically take 15-25 days, ensuring guaranteed quality.
Q4: How do I handle a Custom-made (OEM/ODM) order?
Please send us your new product drawings or samples. We will provide professional advice to maximize performance and realize your design.
Q5: What are the payment terms?
Typically, for production, a 30% deposit is required via T/T before production, with the balance paid before shipment.
Q6: Which mode of transport is recommended?
Since these industrial products are often heavy, we generally advise sea delivery, though we respect your preference for other transportation methods.

Related Products